Every
feature of the course is designed in detail
prior to construction which eliminates
future maintenance problems.
Can the
course be built within budget? Can the course be built on
time? These are two of the most asked questions by clients.
The answer is YES! David Ginkel Design prepares design drawings,
such as colored route plans, site sketches and perspective
renderings in order to convey their ideas visually to clients,
other design professionals and governmental officials. From
the design drawings detailed construction documents and specifications
are prepared. These detail documents provide accurate information,
which allows the golf course contractor to bid a project accurately
and build it within budget. David Ginkel Design is committed
to provide the most detailed and state-of the-art technical
designs drawings in the industry.